No. | Blacklisted Entity | Procuring Entity |
Project | Offense/s | Sanction Imposed | Start Date | End Date |
1 | AK Annes Kitchen Food, Inc | Subic Bay Metropolitan Authority | Catering Services: For SBMA 2022 Year-end Thanksgiving Affair (Lot C) | 1.) Failure by the contractor to fully and faithfully comply with its contractual obligations without valid cause 2.) Unsatisfactory progress in the delivery of the goods by the manufacturer |
One Year Blacklisting | April 14, 2023 | April 13, 2024 |
2 | Jessie Construction Services | Department of Public Works and Highways Central Office | 20PE0100, Construction/Improvement of Access Roads Leading to Declared Tourism Destinations – Timbac Caves Road Leading to Timbac Caves and Mummy of Apo Anno, Atok/Kabayan, Benguet | Poor performance by the contractor or unsatisfactory quality and/or progress of work arising from his fault or negligence as reflected in the CPES rating sheet – Negative slippage of 15%. | One Year Blacklisting | April 17, 2023 | April 16, 2024 |
3 | Jozeth Trading | Department of Education – Regional Office I | Supply and Door-to-Door Delivery of Technical, Vocational and Livelihood Materials, Tools and Equipment for Public Senior High Schools in DepEd Region I on the lots (Lot Nos. 1, 8, 11, 13, 17, 18, 19, 21, 22, 26, B5, B6, B11, B13 and B14) | Failure by the contractor to fully and faithfully comply with its contractual obligations without valid cause, or failure by the contractor to comply with any written lawful instruction of the procuring entity or its representative(s) pursuant to the implementation of the contract.
Willful or deliberate abandonment or non-performance of the project or contract by the contractor resulting to substantial breach thereof without lawful and/or just cause. |
One Year Blacklisting | April 18, 2023 | April 18, 2024 |
4 | Global Myoho Renge Copy, Inc | Philippine Amusement and Gaming Corporation | Procurement of Consulting Services for the Development, Operation, and Management of Intermediation Platform/Audit Program for the Philippine Offshore Gaming Operations (POGO) | Terminition for default | One Year Blacklisting | April 20, 2023 | April 19, 2024 |
5 | Highweb Trade Ltd. | Philippine Amusement and Gaming Corporation | Procurement of Consulting Services for the Development, Operation, and Management of Intermediation Platform/Audit Program for the Philippine Offshore Gaming Operations (POGO) | Terminition for default | One Year Blacklisting | April 20, 2023 | April 19, 2024 |
6 | COMFAC Corporation | Philippine Amusement and Gaming Corporation | Procurement of Consulting Services for the Development, Operation, and Management of Intermediation Platform/Audit Program for the Philippine Offshore Gaming Operations (POGO) | Terminition for default | One Year Blacklisting | April 20, 2023 | April 19, 2024 |
7 | Mendo Enterprises | Office of the Press Secretary | Procurement of Supply and Delivery of Motor Vehicle Parts for Repair and Maintenance of OPS Vehicles | 1.) Failure of the contractor, due solely to his fault or negligence, to mobilize and start work or performance within the specified period in the Notice to Proceed (NTP).
2.) Failure by the contractor to fully and faithfully comply with its contractual obligations without valid cause, or failure by the contractor to comply with any written lawful instruction of the procuring entity or its representative(s) pursuant to the implementation of the contract. 3.) Unsatisfactory progress in the delivery of the goods by the manufacturer, supplier or distributor arising from his fault or negligence and/or unsatisfactory or inferior quality of goods, as may be provided in the contract. |
One Year Blacklisting | April 24, 2023 | April 23, 2024 |
8 | DCLABRO3 Construction | National Power Corporation | Expansion and Repair of Powerhouse and Transfer of Switchyard of Itbayat DPP | Failure by the contractor to fully and faithfully comply with its contractual obligations without valid cause, or failure by the contractor to comply with any written lawful instruction of the procuring entity or its representative(s) pursuant to the implementation of the contract
Willful or deliberate abandonment or non-performance of the project or contract by the contractor resulting to substantial breach thereof without lawful and/or just cause. The contractor has engaged, before or during implementation of the contract, in unlawful deeds and behaviors relative to contract acquisition and implementation as enumerated in Section III.D. of the Guidelines on Termination of Contracts. |
One Year Blacklisting | May 15, 2023 | May 14, 2024 |
9 | E.S. Pua Construction | National Irrigation Administration MARIIS Division III | 2023-D3-RNIS-Aurora-Package 9 | 21.) Poor performance by the contractor or unsatisfactory quality and/or progress of work arising from his fault or negligence as reflected in the CPES rating sheet – Negative slippage of 15%. | One Year Blacklisting | May 17, 2023 | May 16, 2024 |
10 | Rolando C. Siccion Surveying Office | Department of Public Works and Highways Central Office | 22CSZ018 – Consulting Services for the Environmental Impact Assessment, Gender-Responsive Social Impact Assessment, and Preliminary Right-of-Way Action Plan of the Metro Cebu Expressway Project | Submission of Bids that contain false information or falsified documents, or the concealment of such information in the Bids in order to influence the outcome of eligibility screening or any other stage of the public bidding. | One Year Blacklisting | May 18, 2023 | May 17, 2024 |
11 | Heratyke Trading | Department of Public Works and Highways Central Office | PO No. C 0113-0313-19 Procurement of One (1) Unit Flipchart and one (1) unit Data Center Labelling Tool | Failure by the contractor to fully and faithfully comply with its contractual obligations without valid cause, or failure by the contractor to comply with any written lawful instruction of the procuring entity or its representative(s) pursuant to the implementation of the contract. | One Year Blacklisting | May 25, 2023 | May 24, 2024 |
12 | Aremos Security and Investigation Agency | Sandiganbayan | One (1) Lot Provision of Third Party Security Services Personnel and K-9 Team for the Sandiganbayan for One (1) Year | Failure by the contractor to fully and faithfully comply with its contractual obligations without valid cause, or failure by the contractor to comply with any written lawful instruction of the procuring entity or its representative(s) pursuant to the implementation of the contract. | One Year Blacklisting | June 05, 2023 | June 04, 2024 |
13 | N-22 Construction and Trading | Clark Development Corporation | Metal Barrier along M.A. Roxas Highway/Road Safety | Submission of eligibility requirements containing false information or falsified documents. | One Year Blacklisting | June 05, 2023 | June 04, 2024 |
14 | CTC Builders and Supplies Inc. | Department of Public Works and Highways Central Office | 22FE0064 – OO1: Bridge Program – Widening of Permanent Bridges – Bagula Bridge (B00390LZ), along Daang Maharlika (LZ) | Willful or deliberate abandonment or non-performance of the project or contract by the contractor resulting to substantial breach thereof without lawful and/or just cause. | One Year Blacklisting | June 07, 2023 | June 06, 2024 |
15 | Sheen Consumers Cooperative | Provincial Government of Negros Occidental | Various Procurement Projects from Calendar Year 2018 – 2022 | Allowing the use of one’s name, or using the name of another for purpose of public bidding. | One Year Blacklisting | June 26, 2023 | June 25, 2024 |
16 | Vancity Construction | Department of Agriculture | Construction of Sinamongan Small Water Impounding Project | Failure by the contractor to fully and faithfully comply with its contractual obligations without valid cause, or failure by the contractor to comply with any written lawful instruction of the procuring entity or its representative(s) pursuant to the implementation of the contract.
Poor performance by the contractor or unsatisfactory quality and/or progress of work arising from his fault or negligence as reflected in the CPES rating sheet – Negative slippage of 15%. Willful or deliberate abandonment or non-performance of the project or contract by the contractor resulting to substantial breach thereof without lawful and/or just cause. |
One Year Blacklisting | June 27, 2023 | June 26, 2024 |
17 | Renton Engineering Services | Department of Public Works and Highways Central Office | 22PD0037 Basic Infrastructure Program (BIP) – Construction of Road from Scout Barrio Main Road to Barangay Upper Dagsian, Baguio City, Benguet | Failure of contractor to repair works, at his own expense, of any defect or damage to the infrastructure projects on account of the use of materials of inferior quality within ninety (90) days from the time the HoPE has issued an order to undertake repair. | One Year Blacklisting | June 27, 2023 | June 26, 2024 |
18 | GoldenTec Contractor Corporation | University of the Philippines | One (1) Lot Installation of New Street Lighting Along the Academic Oval University of the Philippines Diliman Campus, Quezon City | 1) Failure by the contractor to fully and faithfully comply with its contractual obligations without valid cause, or failure by the contractor to comply with any written lawful instruction of the procuring entity or its representative(s) pursuant to the implementation of the contract. 2) Willful or deliberate abandonment or non-performance of the project or contract by the contractor resulting to substantial breach thereof without lawful and/or just cause. | One Year Blacklisting | July 05, 2023 | July 04, 2024 |
19 | SSR Construction and Enterprise | National Food Authority – Regional Office XIV | Repair/Rehabilitation of NFA Sulu Provincial Office | 21.) Poor performance by the contractor or unsatisfactory quality and/or progress of work arising from his fault or negligence as reflected in the CPES rating sheet – Negative slippage of 15%. 22.) Poor performance by the contractor or unsatisfactory quality and/or progress of work arising from his fault or negligence as reflected in the CPES rating sheet – Quality of materials and workmanship not complying with the approved specifications. 23.) Willful or deliberate abandonment or non-performance of the project or contract by the contractor resulting to substantial breach thereof without lawful and/or just cause. |
Two Year Blacklisting | July 08, 2022 | July 07, 2024 |
20 | Treadstone Konstruct and Building Supply Specialist, Inc. | Philippine International Trading Corporation | Construction/Repair/Rehabilitation of Academic Buildings, Second Floor CAS Annex II and UPMO Building of the University of the Philippines Los Baños | Failure by the contractor to fully and faithfully comply with its contractual obligations without valid cause, or failure by the contractor to comply with any written lawful instruction of the procuring entity or its representative(s) pursuant to the implementation of the contract.
Poor performance by the contractor or unsatisfactory quality and/or progress of work arising from his fault or negligence as reflected in the CPES rating sheet – Negative slippage of 15%. Willful or deliberate abandonment or non-performance of the project or contract by the contractor resulting to substantial breach thereof without lawful and/or just cause. |
One Year Blacklisting | July 12, 2023 | July 11, 2024 |
21 | Treadstone Konstruct and Building Supply Specialist, Inc. | Philippine International Trading Corporation | Construction/Repair/Rehabilitation of Academic Buildings, Second Floor CAS Annex II and UPMO Building of the University of the Philippines Los Baños | Failure by the contractor to fully and faithfully comply with its contractual obligations without valid cause, or failure by the contractor to comply with any written lawful instruction of the procuring entity or its representative(s) pursuant to the implementation of the contract.
Poor performance by the contractor or unsatisfactory quality and/or progress of work arising from his fault or negligence as reflected in the CPES rating sheet – Negative slippage of 15%. Willful or deliberate abandonment or non-performance of the project or contract by the contractor resulting to substantial breach thereof without lawful and/or just cause. |
One Year Blacklisting | July 12, 2023 | July 11, 2024 |
22 | DCLABRO3 Construction | Philippine Air Force Procurement Center | PAFPC-CDS-21-200 Improvement of AWC Building at FAB | Failure by the contractor to fully and faithfully comply with its contractual obligations without valid cause, or failure by the contractor to comply with any written lawful instruction of the procuring entity or its representative(s) pursuant to the implementation of the contract. | One Year Blacklisting | July 14, 2023 | July 13, 2024 |
23 | DCLABRO3 Construction | National Power Corporation | Renovation of ERSD Warehouse and PES Laboratory at Minuyan, San Jose Del Monte, Bulacan | Refusal or failure to post the required performance security within the prescribed time. | Two Year Blacklisting | August 01, 2022 | July 31, 2024 |
24 | R2CG Builders, Inc. | Polytechnic University of the Philippines | Repair/Rehabilitation of Hasmin Hotel Building | 1. Withdrawal, without justifiable reason, of bid during the period of bid validity required in the bidding documents; and 2. Submission of eligibility requirements containing false information or falsified documents. |
Two Year Blacklisting | August 03, 2022 | August 03, 2024 |
25 | Kuatako Construction & General Contractor | Philippine Overseas Employment Administration | Renovation of POEA Building Ground Floor and 2nd Floor Male and Female Public Comfort Rooms | Failure by the contractor to fully and faithfully comply with its contractual obligations without valid cause, or failure by the contractor to comply with any written lawful instruction of the procuring entity or its representative(s) pursuant to the implementation of the contract; Willful or deliberate abandonment or non-performance of the project or contract by the contractor resulting to substantial breach thereof without lawful and/or just cause. | Two Year Blacklisting | August 05, 2022 | August 05, 2024 |
26 | ELPA Construction | Philippine Air Force Procurement Center | PAFPC-CDS-19-134 Repair of Barracks 5191, Building Nr 9003-002 | Failure by the contractor to fully and faithfully comply with its contractual obligations without valid cause, or failure by the contractor to comply with any written lawful instruction of the procuring entity or its representative(s) pursuant to the implementation of the contract. | Two Year Blacklisting | August 21, 2022 | August 21, 2024 |
27 | RPD Consulting Inc. | National Irrigation Administration – Regional Office No. 8 | Consulting Services for Formulation of Irrigation Water Resources Management Plan (IWRMP) in Preparation of Rehabilitation of Water Resources Management Supporting Irrigation Systems of BITO River Irrigation System. | Poor performance by the consultant of his services arising from his fault or negligence. Failure to deliver critical outputs due to consultants fault or negligence. Outside of force majeure, the Consultant fails to deliver or perform the Outputs and Deliverables within the period(s) specified in the contract, or within any extension thereof granted by the Procuring Entity pursuant to a request made by the Consultant prior to the delay | One Year Blacklisting | August 25, 2023 | August 25, 2024 |
28 | RPD Consulting Inc. | National Irrigation Administration – Regional Office No. 8 | Consulting Services for Formulation of Irrigation Water Resources Management Plan (IWRMP) in Preparation of Rehabilitation of Water Resources Management Supporting Irrigation Systems of BITO River Irrigation System. | Poor performance by the consultant of his services arising from his fault or negligence. Failure to deliver critical outputs due to consultants fault or negligence. Outside of force majeure, the Consultant fails to deliver or perform the Outputs and Deliverables within the period(s) specified in the contract, or within any extension thereof granted by the Procuring Entity pursuant to a request made by the Consultant prior to the delay | One Year Blacklisting | August 25, 2023 | August 25, 2024 |
29 | Paropa Construction and Supply | Department of Health Center for Health and Development Caraga ( DOH CHD Caraga) | Proposed Completion/Repair/Renovation of Brgy. Tangbo BHS | 1.) Willful or deliberate abandonment or non-performance of the project or contract by the contractor resulting to substantial breach thereof without lawful and/or just cause. 2.) Failure by the contractor to fully and faithfully comply with its contractual obligations without valid cause, or failure by the contractor to comply with any written lawful instruction of the procuring entity or its representative(s) pursuant to the implementation of the contract. |
One Year Blacklisting | September 05, 2023 | September 04, 2024 |
30 | EGCG Builders and Supply | Municipal Government Unit of Libungan, Cotabato | Re-bidding of Procurement of Information & Communication Technology Equipment | 1.) Failure of the contractor, due solely to his fault or negligence, to mobilize and start work or performance within the specified period in the Notice to Proceed (“NTP”). 2.) Failure by the contractor to fully and faithfully comply with its contractual obligation without valid cause, or failure by the contractor to comply with any written lawful instruction of the procuring entity or its representative(s) pursuant to the implementation of the contract. | One Year Blacklisting | September 13, 2023 | September 12, 2024 |
31 | Eric Van P. Sesbreño Constrcution | Land Bank of the Philippines | Rosario CEZ (Cavite) Branch Renovation; Ilagan (Isabela) Branch Expansion/Reovation & Northern Isabela LC Fit-Out; Trece Martires (Cavite) and Burauen (Leyte) Branches Two-Storey Building Construction | Failure by the contractor to fully and faithfully comply with its contractual obligations without valid cause, or failure by the contractor to comply with any written lawful instruction of the procuring entity or its representative(s) pursuant to the implementation of the contract.
Poor performance by the contractor or unsatisfactory quality and/or progress of work arising from his fault or negligence as reflected in the CPES rating sheet – Negative slippage of 15%. |
One Year Blacklisting | September 20, 2023 | September 19, 2024 |
32 | Northern Star Investigation & Security Agency | Veterans Federation of the Philippines | Procurement of Security Services | For the irregular Remittances of Social Security System (SSS), PhilHealth, and Home Development Mutual Fund (Pag-ibig) monthly contributions of the personnel. | One Year Blacklisting | September 20, 2023 | September 20, 2024 |
33 | L.M. Baltonado Construction | Department of Public Works and Highways Central Office | 1.) 19IA0007 – Rehabilitation of Damaged Paved Roads – Tertiary Roads, Maripipi Circumferential Road, K0014+000 – K0015+500 (From 11.81517314 deg, 124.3176803 deg to 11.81536483 deg, 124.329689 deg) and, 2.) 20IA0023 – Asset Preservation – Rehabilitation/Reconstruction/Upgrading of Damaged Paved – Tertiary Roads – Maripipi Circumferential Road, K0004+585 – K0006+600 (124.51507, 11.58347 – 124.51518, 11.58332) Maripipi, Biliran Province | 1.) Failure by the contractor to fully and faithfully comply with its contractual obligations without valid cause, or failure by the contractor to comply with any written lawful instruction of the procuring entity or its representative(s) pursuant to the implementation of the contract. 2.) Poor performance by the contractor or unsatisfactory quality and/or progress of work arising from his fault or negligence as reflected in the CPES rating sheet – Negative slippage of 15%. 3.) Willful or deliberate abandonment or non-performance of the project or contract by the contractor resulting to substantial breach thereof without lawful and/or just cause. |
Two Year Blacklisting | December 12, 2022 | December 11, 2024 |
34 | GU Engineering Solutions Inc. | National Irrigation Administration-Magat River Integrated Irrigation System-Dam and Reservoir Division | Tandem High Pressure Gates Refurbishment | Refusal or failure to post the required performance security within the prescribed time. | Two Year Blacklisting | February 03, 2023 | February 02, 2025 |
35 | DCLABRO3 Construction | Philippine Air Force Procurement Center | PAFPC-CDS-21-201 Rehabilitation of the 557th CEISS Building and Facilities at FAB | Failure by the contractor to fully and faithfully comply with its contractual obligations without valid cause, or failure by the contractor to comply with any written lawful instruction of the procuring entity or its representative(s) pursuant to the implementation of the contract. | Two Year Blacklisting | July 15, 2023 | July 14, 2025 |
36 | DCLABRO3 Construction | Philippine Air Force Procurement Center | PAFPC-CDS-21-202 Repair of Bulwagang Malipunyo Building at FAB | Failure by the contractor to fully and faithfully comply with its contractual obligations without valid cause, or failure by the contractor to comply with any written lawful instruction of the procuring entity or its representative(s) pursuant to the implementation of the contract. | Two Year Blacklisting | July 16, 2023 | July 15, 2025 |
37 | Fortuner Security Services | LBP Resources and Development Corporation | A. LBRDC Real and Other Properties Acquired B. NCR, Luzon, Visayas and Mindanao |
Other violation: Violation of provision and DOLE Department Order No. 150-16: delayed payment of salaries and non-remittance of mandatory contributions of the security guards. | One Year Blacklisting | September 26, 2023 | September 25, 2024 |
38 | ACRHOCONS Corporation | Bureau of Fisheries and Aquatic Resources Regional Office No. 8 | 1. Labor and Materials for the Improvement of RBAPC Station and Fish Pond Dikes under RA. 10861, Lavezares, Northern Samar
2. Labor and Materials for the Construction of Training Center at Brgy. Combado, Maasin City, Southern Leyte
3. Labor and Materials for the Construction of Multi-Species Marine Hatchery at Brgy. Manhilo, Maasin City, Southern Leyte |
Failure by the contractor to fully and faithfully comply with its contractual obligations without valid cause, or failure by the contractor to comply with any written lawful instruction of the procuring entity or its representative(s) pursuant to the implementation of the contract. |
One Year Blacklisting | September 28, 2023 | September 27, 2024 |
39 | Wide Integrated Solutions Expert (WISE) Corporation | Philippine Center for Economic Development | Supply, Installation, Implementation and Commissioning of Integrated Management System Application Software Developed Solely for UPSEPhase 1 – Lot 1 and Lot 2 | 1.) Failure by the contractor to fully and faithfully comply with its contractual obligations without valid cause, or failure by the contractor to comply with any written lawful instruction of the procuring entity or its representative(s) pursuant to the implementation of the contract.2.) Unsatisfactory progress in the delivery of the goods by the manufacturer, supplier or distributor arising from his fault or negligence and/or unsatisfactory or inferior quality of goods, as may be provided in the contract. |
One Year Blacklisting | October 12, 2023 | October 11, 2024 |
40 | D.L Cervantes Corporation./Kimikarlai Construction Development Corp. – JV | Civil Aviation Authority of the Philippines (CAAP) | Tuguegarao Airport Development Project (Rehabilitation of Existing PTB, Construction of Administrative Building and Construction of Pumphouse) | During the contract implementation stage, for the failure by the contractor/supplier to fully and faithfully comply with its contractual obligations without a valid cause, or failure by the contractor to comply with any written lawful instruction of the procuring entity or its representative(s) pursuant to the implementation of the contract. | One Year Blacklisting | September 7, 2023 | September 7, 2024 |
41 | DLL & Sons Company Asia Ltd. | Authority of the Freeport Area Bataan (AFAB) | Construction of Underground Cabling (Stage 4) | Poor performance by the contractor or unsatisfactory quality and/or progress of work arising from his fault or negligence as reflected in the CPES rating sheet – Negative slippage of 15%. | One Year Blacklisting | October 13, 2023 | October 12, 2024 |
42 | La Marina Enterprises Inc. | Procurement Service-Department of Budget and Management (PS-DBM) | Supply, Delivery and Tailoring Services of Various Office Uniforms for the Employees of Procurement Service-Department of Budget and Management (PS-DBM) Offices and Regional Depots | The contractor has engaged, before or during implementation of the contract, in unlawful deeds and behaviors relative to contract acquisition and implementation as enumerated in Section III.D. of the Guidelines on Termination of Contracts. | One Year Blacklisting | November 03, 2023 | November 02, 2024 |
43 | Test Consultants, Inc. | National Irrigation Administration-Region I | Consulting Services for the Conduct of Social and Environmental Impact Assessment of Cabacanan SRIP-Republication | Poor performance by the consultant his services arising from his fault or negligence – Failure to deliver critical outputs due to consultant’s fault or negligence. | One Year Blacklisting | November 01, 2023 | October 31, 2024 |
44 | La Suerta’s Fruit Trees Nursery | City of Valencia, Province of Bukidnon | Vermicompost Purchase of Supplies for Organic Production Inputs Distribution for the 4th Quarter 2022 | Failure by the contractor to fully and faithfully comply with its contractual obligations without valid cause, or failure by the contractor to comply with any written lawful instruction of the procuring entity or its representative(s) pursuant to the implementation of the contract. | One Year Blacklisting | July 14, 2023 | July 14, 2024 |
45 | RBLG Enterprises | Philippine Amusement and Gaming Corporation | Supply and Delivery of Various Office Supplies | Termination for Default. The supplier failed to complete its obligation under the contract. (Undelivered Portion of the Purchase Order No. 6999) | One Year Blacklisting | September 21, 2023 | September 20, 2024 |
46 | MTC Construction Services | Provincial Government of Antique | A. RE-IB No. K-2023-007(D&B): Design and Build for the Construction of Sewage Treatment Plant (STP) Malumpati Health Spring, Pandan, Antique | Failure or refusal, without justifiable reason, to accept the award and enter into contract or perform any and all acts necessary to the execution of the contract, in accordance with the bidding documents, after having been duly notified of the acceptance | Two Year Blacklisting | October 23, 2023 | October 23, 2025 |
47 | JJTP Builders and Supply | Environmental Management Bureau-MIMAROPA Region | Establishment of Materials Recovery Facilities (MRFs) within the Administrative Jurisdiction of MIMAROPA Region (4 lots) – 2nd posting | Failure to finish the project for the establishment of MRF in the following Municipalities in the province of Palawan within the given period despite several follow-up by the EMB MIMAROPA
Municipality of Coron, Palawan (Brgy. Bintuan) |
Two Year Blacklisting | July 01, 2023 | June 30, 2025 |
48 | C.M.O. Construction Services Corp. | Philippine Coast Guard-National Headquarters | 1. Construction of Coast Guard Station Cebu Building 2. Construction of Coast Guard Station Cebu Catbalogan Building 3. Construction of Coast Guard Station Tagbilaran Building 4. Construction of Coast Guard Station Cavite Building 5. Construction of Coast Guard District Eastern Visayas Facilities |
Failure by the contractor to fully and faithfully comply with its contractual obligations without valid cause, or failure by the contractor to comply with any written lawful instruction of the procuring entity or its representative(s) pursuant to the implementation of the contract.
Willful or deliberate abandonment or non-performance of the project or contract by the contractor resulting to substantial breach thereof without lawful and/or just cause. |
One Year Blacklisting | October 18, 2023 | October 16, 2024 |
49 | Red Diamond Construction | Philippine International Trading Corporation | Repair and Rehabilitation of Enlisted Personnel Career Advance Course (EPCAC) Building 7301 for the Philippine Navy (PN) – One (1) Lot under Contract Ref. No. 2019-245 | Failure by the contractor to fully and faithfully comply with its contractual obligations without valid cause, or failure by the contractor to comply with any written lawful instruction of the procuring entity or its representative(s) pursuant to the implementation of the contract.
Poor performance by the contractor or unsatisfactory quality and/or progress of work arising from his fault or negligence as reflected in the CPES rating sheet – Negative slippage of 15% |
One Year Blacklisting | October 25, 2023 | October 24, 2024 |
50 | Sparrow Integrated Services Inc. (SISI) | Veterans Federation of the Philippines | Procurement of Janitorial Services | Failure by the contractor to fully and faithfully comply with its contractual obligations without valid cause, or failure by the contractor to comply with any written lawful instruction of the procuring entity or its representative(s) pursuant to the implementation of the contract. | One Year Blacklisting | November 03, 2023 | November 02, 2024 |
51 | RDY3 General Merchandise | Movie and Television Review and Classification Board (MTRCB) | Supply and Delivery of Furniture and Fixtures for the MTRCB | D. Termination for Unlawful Acts
a.) Corrupt, fraudulent, collusive and coercive practices; (Emphasis supplied) – Fraudulent Practice means a misrepresentation of facts in order to influence a selection process or the execution of a contract to the detriment of the Procuring Entity. (Emphasis supplied) |
One Year Blacklisting | November 01, 2023 | October 31, 2024 |
52 | MLTP Enterprises | Philippine Marine Corps | Supply and Delivery of OPTAR Requirements of PMC, Lot-3 Other Supplies and Materials Expenses | Unsatisfactory progress in the delivery of the goods by the supplier arising from her fault or negligence, as may be provided in the contract. | Two Year Blacklisting | November 15, 2023 | November 15, 2025 |
53 | Tri-Green Supply and Technology | Department of Environment and Natural Resources-NCR | Supply and Delivery of Various Office Supplies | Unsatisfactory progress in the delivery of the goods by the manufacturer, supplier or distributor arising from his fault or negligence and/or negligence unsatisfactory or inferior quality of goods, as may be provided in the contract. | One Year Blacklisting | November 20, 2023 | November 20, 2024 |
54 | Tri-Green Supply and Technology | Department of Environment and Natural Resources-NCR | Supply and Delivery of Various Office Supplies | Unsatisfactory progress in the delivery of the goods by the manufacturer, supplier or distributor arising from his fault or negligence and/or negligence unsatisfactory or inferior quality of goods, as may be provided in the contract. | One Year Blacklisting | November 20, 2023 | November 20, 2024 |
55 | Tri-Green Supply and Technology | Department of Environment and Natural Resources-NCR | Supply and Delivery of Various Hardware and Office Supplies | Unsatisfactory progress in the delivery of the goods by the manufacturer, supplier or distributor arising from his fault or negligence and/or negligence unsatisfactory or inferior quality of goods, as may be provided in the contract. | One Year Blacklisting | November 20, 2023 | November 20, 2024 |
56 | Tri-Green Supply and Technology | Department of Environment and Natural Resources-NCR | Supply and Delivery of Various Office Supplies | Unsatisfactory progress in the delivery of the goods by the manufacturer, supplier or distributor arising from his fault or negligence and/or negligence unsatisfactory or inferior quality of goods, as may be provided in the contract. | One Year Blacklisting | November 20, 2023 | November 20, 2024 |
57 | Tri-Green Supply and Technology | Department of Environment and Natural Resources-NCR | Supply and Delivery of Furniture and Tableware | Unsatisfactory progress in the delivery of the goods by the manufacturer, supplier or distributor arising from his fault or negligence and/or negligence unsatisfactory or inferior quality of goods, as may be provided in the contract. | One Year Blacklisting | November 20, 2023 | November 20, 2024 |
58 | Tri-Green Supply and Technology | Department of Environment and Natural Resources-NCR | Supply and Delivery/Installation of Vehicle Part and Accessories | Unsatisfactory progress in the delivery of the goods by the manufacturer, supplier or distributor arising from his fault or negligence and/or negligence unsatisfactory or inferior quality of goods, as may be provided in the contract. | One Year Blacklisting | November 20, 2023 | November 20, 2024 |
59 | Jebron Builders Development Corporation | Philippine Coast Guard – National Headquarters | Rewiring/Upgrading of CGAF Electrical System | Failure by the contractor to fully and faithfully comply with its contractual obligations without valid cause, or failure by the contractor to comply with any written lawful instruction of the procuring entity or its representative(s) pursuant to the implementation of the contract.
Willful or deliberate abandonment or non-performance of the project or contract by the contractor resulting to substantial breach thereof without lawful and/or just cause. |
One Year Blacklisting | November 29, 2023 | November 27, 2024 |
60 | Grand Empire Truck and Equipment Rental Co. Ltd. | Provincial Government of Antique | IB No. OO-2022-022: Pick-up Truck with P.O. No.: 2022-11-623
IB No. OO-2022-029: Ambulance Type II (Brand New) with P.O. No.: 2022-11-624 |
Failure of the contractor, due solely to his fault or negligence, to mobilize and start work or performance within the specified period in the Notice to Proceed (NTP)
Unsatisfactory progress in the delivery of the goods by the manufacturer, supplier or distributor arising from his fault or negligence and/or unsatisfactory or inferior quality of goods, as may be provided in the contract. |
Two Year Blacklisting | October 23, 2023 | October 23, 2025 |
61 | Avescor Motors Inc. | Provincial Government of Antique | IB No. L-2023-002: Motor Vehicles Dropside Body (MT) | Refusal or failure to post the required performance security within the prescribed time. | One Year Blacklisting | December 19, 2023 | December 19, 2024 |
62 | AXL Builders and Construction Supplies | Provincial Government of Antique | Completion of Upgrading/Expansion/Repair and Renovation of Ancilliary/Clinical Services and Construction of Sewage Treatment Plant (STP) Tobias Fornier, Antique
Completion of Upgrading/Expansion/Repair and Renovation of Ancilliary/Clinical Services and Construction of Sewage Treatment Plant (STP) Valderrama, Antique |
Poor performance by the contractor or unsatisfactory quality and/or progress of work arising from his fault or negligence as reflected in the CPES rating sheet-Negative slippage of 15% | Two Year Blacklisting | December 19, 2023 | December 19, 2025 |
63 | Fruitful Enterprises | City of Calamba, Laguna | Supply and Delivery of Tent, Office of the City Mayor | Submission of Bids that contain false information or falsified documents, or the concealment of such information in the Bids order to influence the outcome of eligibility screening or any other stage of the public bidding. | One Year Blacklisting | December 29, 2023 | December 28, 2024 |
63 | T.J. Velasco Construction and Supply | Philippine Marine Corps | Supply and Delivery of Construction of Two (2) Storey Personnel Barracks of PMC | Failure by the contractor to fully and faithfully comply with its contractual obligations without valid cause, or failure by the contractor to comply with any written lawful instruction of the procuring entity or its representative(s) pursuant to the implementation of the contract. | One Year Blacklisting | December 29, 2023 | December 28, 2024 |
64 | HERVELYN Intertrading & Builders Corporation | National Irrigation Administration – Malitubog-Maridagao Irrigation Project Phase II | MMIP-II LMC-020, Package I, Construction of Canal Structure along RMC2 Station 8+680-9+480 and Lateral C Station 0+000-1+677 MMIP-II LMC-020, Package III, Construction of Canal Structure along RMC2 Sta. 10+520 to Sta. 11+460 MMIP-II LMC-021, Package I, Construction of Canal Structure along RMC2 Station 11+460 to Sta. 12+540 (1.30km) MMIP-II LMC-021, Package V, Construction of Canal Structure along RMC2 Station 12+540 to Sta. 13+840 (1.30km) |
Abandoning the contact works, refused/failed to comply with a valid instruction of the Project Management Office (PMO) and failed to proceed expeditiously and withour delay despite a written notice by the PMO;
Renewal of the effectivity dates of performance security after its expiration during the course of contract implementation; Does not actually have on the project site the minimum essential equipment listed on the bid necessary to prosecute the works in accordance with the approved work plan and equipment deployment schedule as required for the project; Failure by the contractor to fully and faithfully comply with its contractual obligations without valid cause. |
One Year Blacklisting | January 05, 2024 | January 04, 2025 |
65 | LaTorre Builders and Construction | Philippine Coast Guard | Construction of Coast Guard Sub-Station Allen | Failure by the contractor to fully and faithfully comply with its contractual obligations without valid cause, or failure by the contractor to comply with any written lawful instruction of the procuring entity or its representative(s) pursuant to the implementation of the contract.
Willful or deliberate abandonment or non-performance of the project or contract by the contractor resulting to substantial breach thereof without lawful and/or just cause. |
One Year Blacklisting | January 03, 2024 | January 01, 2025 |
66 | Financial Services-Information Sharing and Analysis Center, Inc. | Bangko Sentral ng Pilipinas | One (1) Lot Multi-Year Online Premier Subscription to Cyber Threat Intelligence (CTI) and Information Sharing Analysis Center (ISAC) | Failure of the contractor, due solely to his fault or negligence, to mobilize and start work or performance within the specified period in the Notice to Proceed (“NTP”).
Failure by the contractor to fully and faithfully comply with its contractual obligations without valid cause, or failure by the contractor to comply with any written lawful instruction of the procuring entity or its representative(s) pursuant to the implementation of the contract. |
One Year Blacklisting | January 08, 2024 | January 08, 2025 |
67 | Tiger Consulting & Software Dev’t., Inc. | National Power Corporation | One (1) Year License and Support for Remote Access and Monitoring Software | Withdrawal of a bid, or refusal to accept an award or enter into a contract with the government without justifiable cause, after he had been adjudged as having submitted the Lowest Calculated Responsive Bid or Highest Rated Responsive Bid.
Failure or Refusal, without justifiable reason, to accept the award and enter into contract or perform any and all acts necessary to the execution of the contract, in accordance with the bidding documents, after having been duly notified of the acceptance. |
One Year Blacklisting | January 12, 2024 | January 11, 2025 |
68 | Aguero Construction | MLGU Tago, Surigao Del Sur | Construction of Anahao Daan Evacuation Center | Failure by the contractor to fully and faithfully comply with its contractual obligations without valid cause, or failure by the contractor to comply with any written lawful instruction of the procuring entity or its representative(s) pursuant to the implementation of the contract.
Poor performance by the contractor or unsatisfactory quality and/or progress of work arising from his fault or negligence as reflected in the CPES rating sheet – Negative slippage of 15%. Poor performance by the contractor or unsatisfactory quality and/or progress of work arising from his fault or negligence as reflected in the CPES rating sheet – Quality of materials and workmanship not complying with the approved specifications. |
Two Year Blacklisting | October 25, 2023 | October 25, 2025 |
69 | SCCIP Office Supplies and Equipment Trading | Department of Budget and Management – Central Office | Procurement of Tokens for the PFMCP Resource Speakers and other PFM-related Sessions | Failure by the contractor to fully and faithfully comply with its contractual obligations without valid cause, or failure by the contractor to comply with any written lawful instruction of the procuring entity or its representative(s) pursuant to the implementation of the contract.
For the procurement of goods, unsatisfactory progress in the delivery of the goods by the manufacturer, supplier or distributor arising from his fault or negligence and/or unsatisfactory or inferior quality of goods, as may be provided in the contract Willful or deliberate abandonment or non-performance of the project or contract by the contractor resulting to substantial breach thereof without lawful and/or just cause. |
One Year Blacklisting | January 12, 2024 | January 11, 2025 |
70 | Patrila Builders, Inc. | Philippine Coast Guard – National Headquarters | Construction of Coast Guard Sub-Station Caluya Building | Failure by the contractor to fully and faithfully comply with its contractual obligations without valid cause, or failure by the contractor to comply with any written lawful instruction of the procuring entity or its representative(s) pursuant to the implementation of the contract. | One Year Blacklisting | January 30, 2024 | January 30, 2025 |
71 | Jesse Care Pest Management Services | Bangko Sentral ng Pilipinas | One (1) Lot – Supply of Manpower, Tools, Equipment, Supplies, Materials, and Supervision for General Pest Control, with Above-Ground Stations, Baiting System and Other Related Services for the Bangko Sentral Ng Pilipinas, Security Plant Complex |
Submission of eligibility requirements containing false information or falsified documents. |
One Year Blacklisting | January 30, 2024 | January 30, 2025 |
72 | Jayben Construction Services | Northern Negros State College of Science and Technology | One Lot Labor anf Materials for the Construction of College of Nursing & Allied Health Sciences Building Phase-1, Sagay Campus | Failure by the contractor to fully and faithfully comply with its contractual obligations without valid cause, or failure by the contractor to comply with any written lawful instruction of the procuring entity or its representative(s) pursuant to the implementation of the contract.
Poor performance by the contractor or unsatisfactory quality and/or progress of work arising from his fault or negligence as reflected in the CPES rating sheet – Negative slippage of 15%. Willful or deliberate abandonment or non-performance of the project or contract by the contractor resulting to substantial breach thereof without lawful and/or just cause. |
One Year Blacklisting | February 01, 2024 | February 01, 2025 |
73 | Leon Cullen’s Trading | Office of the Civil Defense. | Supply and Delivery of Toners and Cartridges for the Various Printers and Photocopiers for the 2nd Semester of CY 2023 | Failure by the contractor to fully and faithfully comply with its contractual obligations without valid cause, or failure by the contractor to comply with any written lawful instruction of the procuring entity or its representative(s) pursuant to the implementation of the contract.
Unsatisfactory progress in the delivery of the goods by the manufacturer, supplier or distributor arising from his fault or negligence and/or unsatisfactory or inferior quality of goods, as may be provided in the contract. |
One Year Blacklisting | February 16, 2024 | February 16, 2025 |
74 | Felcontech Trading and Services, Inc. | Brgy. Purok III, Municipality of Pavia | Supply, Installation, and Commissioning of CCTV Cameras | Poor performance by the supplier arising from his fault or negligence – Supply and Installation of goods items which are inappropriate, substandard or way above accepted standards.
The supplier delivered and installed the 4-MP Bullet Network Camera that falls below specifications as per signed bidding documents. |
One Year Blacklisting | February 29, 2024 | February 28, 2025 |
75 | Eric Van P. Sesbreño Construction | Philippine Veterans Affairs Office | Design and Build of Balete Pass National Shrine Monument and Memorial Wall | Failure of the contractor, due solely to his fault or negligence, to mobilize and start work or performance within the specified period in the Notice to Proceed (“NTP”)
Willful or deliberate abandonment or non-performance of the project or contract by the contractor resulting to substantial breach thereof without lawful and/or just cause. |
One Year Blacklisting | March 04, 2024 | March 04, 2025 |
76 | Lucky Magic Light Trading Co. | Veterans Federation of the Philippines | Procurement of Engineering and Maintenance Equipment | Failure of the contractor, due solely to his fault or negligence, to mobilize and start work or performance within the specified period in the Notice to Proceed (“NTP”)
Failure by the contractor to fully and faithfully comply with its contractual obligations without valid cause, or failure by the contractor to comply with any written lawful instruction of the procuring entity or its representative(s) pursuant to the implementation of the contract. |
One Year Blacklisting | March 04, 2024 | March 04, 2025 |
77 | Paramount Hotels and Facilities Management Company, Inc. | Department of Interior and Local Government | Lease of Venue with Food for the conduct of “Suppliers and Supply Officers Forum for FY 2024” | Withdrawal of a bid, or refusal to accept an award or enter into a contract with the government without justifiable cause, after he had been adjudged as having submitted the Lowest Calculated Responsive Bid or Highest Rated Responsive Bid. | One Year Blacklisting | February 26, 2024 | February 25, 2025 |
78 | CARAGA Farmers and Environmental Developers MPC | National Power Corporation | Supply and Delivery of Seedings as Replacement for the Cut Down Trees Affected by Roxas-Taytay 69KV Transmission Line Project | Refusal or failure to post the required performance security within the prescribed time. | Two Year Blacklisting | March 19, 2024 | March 18, 2026 |
79 |
SODEXO On-Site Services Philippines, Inc. |
Bases Conversion and Development Authority | Procurement of service provider for the Interim Operations and Maintenance (O & M) of the New Clark City Sports Facilities under a 27-month Service Contract through Negotiated Procurement under Two Failed Biddings | Refusal or failure to post the required performance security within the prescribed time.
Failure or refusal, without justifiable reason, to accept the award and enter into contract or perform any and all acts necessary to the execution of the contract, in accordance with the bidding documents, after having been duly notified of the acceptance. |
Two Year Blacklisting | March 25, 2024 | March 25, 2026 |
No. | Blacklisted Entity | Procuring Entity |
Project | Offense/s | Sanction Imposed | Start Date | End Date |
1 | Philippine Life Saving Equipment Inc. | Philippine Merchant Marine Academy | Procurement of Full Mission Bridge Simulator and Full Mission Engine Simulator with Civil Works | Failure by the contractor to fully and faithfully comply with its contractual obligations without valid cause, or failure by the contractor to comply with any written lawful instruction of the procuring entity or its representative(s) pursuant to the implementation of the contract. Unsatisfactory progress in the delivery of the goods by the manufacturer, supplier or distributor arising from his fault or negligence and/or unsatisfactory or inferior quality of goods, as may be provided in the contract. |
Permanent Blacklisting | October 10, 2020 | Permanent |
2 | Bonum Manpower and General Services | Subic Bay Metropolitan Authority | Two (2) Year Contract for Janitorial Services | Failure by the contractor to fully and faithfully comply with its contractual obligations without valid cause, or failure by the contractor to comply with any written lawful instruction of the procuring entity or its representative(s) pursuant to the implementation of the contract.
Unsatisfactory progress in the delivery of the goods by the manufacturer, supplier or distributor arising from his fault or negligence and/or unsatisfactory or inferior quality of goods, as may be provided in the contract. |
Permanent Blacklisting | July 28, 2020 | Permanent |
3 | I.C. Tejada Construction | Department of Social Welfare and Development – National Capital Region | ITB 18-10-17 – Lot 1 Major Repair of Dietary Kitchen for the Elsie Gaches Village ITB 18-07-14 – Lot 9 Construction of Perimeter Wall for the Haven for Women ITB 18-07-14 – Lot 15 Extension of Dietary Kitchen for the Nayon ng Kabataan |
14.) Failure by the contractor to fully and faithfully comply with its contractual obligations without valid cause, or failure by the contractor to comply with any written lawful instruction of the procuring entity or its representative(s) pursuant to the implementation of the contract. 21.) Poor performance by the contractor or unsatisfactory quality and/or progress of work arising from his fault or negligence as reflected in the CPES rating sheet – Negative slippage of 15%. 22.) Poor performance by the contractor or unsatisfactory quality and/or progress of work arising from his fault or negligence as reflected in the CPES rating sheet – Quality of materials and workmanship not complying with the approved specifications. 23.) Willful or deliberate abandonment or non-performance of the project or contract by the contractor resulting to substantial breach thereof without lawful and/or just cause. |
Permanent Blacklisting | March 24, 2023 | Permanent |
4 | Green Leaf Concepts, Services, and Products Co. | City of Baguio, Benguet | Supply, Delivery, and Installation of Strawberry Greenhouses with Planter Boxes, Strawberry runners, and additional framer bee box, including training simultaneous with strawberry cultivation | Failure by the contractor to fully and faithfully comply with its contractual obligations without valid cause, or failure by the contractor to comply with any written lawful instruction of the procuring entity or its representative(s) pursuant to the implementation of the contract.
Unsatisfactory progress in the delivery of the goods by the manufacturer, supplier or distributor arising from his fault or negligence and/or unsatisfactory or inferior quality of goods, as may be provided in the contract. Poor performance by the consultant of his services arising from his fault or negligence – Defective design resulting in substantial corrective works in design and/or construction. Poor performance by the consultant of his services arising from his fault or negligence – Failure to deliver critical outputs due to consultant’s fault or negligence. Willful or deliberate abandonment or non-performance of the project or contract by the contractor resulting to substantial breach thereof without lawful and/or just cause. |
Permanent Blacklisting | April 06, 2023 | Permanent |
No. | Blacklisted Entity | Procuring Entity |
Project | Offense/s | Sanction Imposed | Start Date | End Date |
1 | RR Encabo Contructors Inc | Department of Health – Central Office | Renovation and Retrofitting of Research Institute for Tropical Medicine under WB-PCERP-39-2022 | Failure of the contractor, due solely to his fault or negligence, to mobilize and start work or performance within the specified period in the Notice to Proceed (NTP). Failure by the contractor to fully and faithfully comply with its contractual obligations without valid cause, or failure by the contractor to comply with any written lawful instruction of the procuring entity or its representative(s) pursuant to the implementation of the contract. Poor performance by the contractor or unsatisfactory quality and/or progress of work arising from his fault or negligence as reflected in the CPES rating sheet – Negative slippage of 15%. |
One Year Blacklisting | March 13, 2023 | March 14, 2024 |
2 | Bio Medpro Pharmaceuticals | City Government of Valencia, Bukidnon | Dental Chair for Clines Use Only (MOOE) 1st Quarter 2023 | Failure by the contractor to fully and faithfully comply with its contractual obligations without valid cause, or failure by the contractor to comply with any written lawful instruction of the procuring entity or its representative(s) pursuant to the implementation of the contract. | One Year Blacklisting | October 19, 2023 | October 19, 2024 |